Wagga Wagga Solar PV (Photovoltaic) Installation

Project Snapshot

  • Location: Wagga Wagga
  • Cost: $3,500,000
  • Estimated Completion date:
    September 2017
  • Contact: Peter Harris
  • Category: University Support
  • Interruptions

    There may be interruptions to the occupants of the buildings which are having panels installed on them.

Solar PV Project Wagga

Scope

In 2016 CSU became the first carbon neutral university in Australia. This project continues to enhance CSUs reputation as a leading practitioner of sustainability within the university segment.

CSU will install over 6,000 solar panels over the rooftops of various buildings at our Wagga campus. The installed capacity of the system will be 1,774 kW making it one of the largest rooftop installations in Australia.

The electricity generated by the panels will be enough to provide 20% of the electricity usage of CSU at Wagga Wagga.

Design Features

The system has been designed to generate as much solar energy as possible whilst minimising the amount of energy which is exported to the grid.

Sustainability Features

The 1,774 kW installation is expected to generate 2,620,000 kWh in its first year of operation which is equivalent to 2,330 tonnes CO2.

The project will assist CSU to meet its targets for embedded generation and carbon neutrality.

Additional Information

The project is being funded by a loan from Westpac and the Clean Energy Finance Corporation. The loan is repayable over a 10 year period and the repayments will be made from the savings on electricity expenditure.

Consultants

Head contractor: Todae Solar

Buildings Included at the Wagga Wagga Campus:

Any interruptions which are required, will be scheduled at the most convenient time possible and communicated in advance. Rooftops included within the installation are those of buildings 13, 21, 30, 125, 279, 283, 288, 289, 295, 411 & 452-458.